National Electrical Code 2023 Basics: Grounding and Bonding Part 12
Tion 250.53(A) Rod, Pipe, and Plate Electrodes53(A)(1) Below Constant Moisture Level53(A)(2) Supplemental Electrode Required53(A)(3) Supplemental Electrode53(A)(4) Rod and Pipe ElectrodesTion 250.53(B) Electrode SpacingTion 250.53(C) Bonding JumperTion 250.53(D) Metal Underground Water PipeTion 250.53(E) Bonding Jumper Size For The Supplemental Grounding ElectrodeThe electrode must be installed straight down for at least 2.44 m in length, contacting the soil. Connecting a 2.44-long rod above the ground surface will not comply with the rule. Where encountering rock bottom, the electrode may be pushed at an oblique angle not to exceed 45° from a vertical line–keeping at least 2.44 m of its length inside the g...See more on eepower expertce
How to Install a Ground Rod: NEC Spacing and Depth
A step-by-step guide to installing ground rods for a grounding electrode system. Covers NEC requirements for depth, spacing, and connecting the GEC.