The distribution box shall be embedded in the wall. During wall construction, the reserved hole shall be about 20mm larger than the length and width of the distribution box. The reserved depth is the thickness of the distribution box plus the thickness of plastering. For fixed distribution boxes and switch boxes, the vertical distance from the bottom to the ground shall be more than 1. Choose the right box based on environment (indoor/outdoor), load capacity, and durability. Check for proper IP/NEMA ratings and material quality. The body of the boxes shall have sufficient re- enforcement with suitable size of channels keeping a provision for fixin andle conforming to general. required. To extinguish the arc immediately in iso ators, in each phase arc-chutes with minimum 12 strips ype. The handle of the isolator should 3 er m ab u in n. The installation requirements and specifications of Distribution box involve many aspects, including site selection, fixing method, wiring specifications and safety protection.